Announcements Local

Building Works At NT Porth (Towan)

Work has started in earnest down at Porth as they concert the workshops into a new café.  You can access the beach via the path just a bit further down the road through the gate.

The AED (defibrillator) which was in the lobby of the loos has been placed on the wall of the covered walkway towards the beach. During working hours this will be accessible via the builders.

As per the signage which was put up in October, the loos will be closed throughout the works and there will be no substitution during this winter.

Leave a Comment